Mobile guard and patrol app

Empower your guards with a simple, reliable mobile app for patrols, tours, and real-time guard tracking. All in one app.

Get started for free
Mobile guard and operations screenshot

Clocking in and out

Accurately track attendance with digital clock-in and clock-out. Every shift is recorded automatically, reducing paperwork and payroll errors.

Time tracking
Automatic shift records
Clocking in and out

Automatic daily activity reports

Daily Activity Reports (DARs) are automatically generated and tied to each guard's shift, giving you a complete timeline of tasks, patrols, and incidents with zero extra effort.

Automatic DARs
Shift reporting
Automatic daily activity reports

Real-time location tracking

Know where guards are at all times. Every activity is GPS-tagged to improve accountability, visibility, and safety during patrols.

GPS precision
Real-time updates
Real-time location tracking

Flexible checkpoint logging

Log checkpoints however your site requires: QR codes, NFC tags, or manual entry. Ideal for indoor, outdoor, and high-security environments.

QR checkpoints
NFC
Manual option
Flexible checkpoint logging

Guided patrol tours

Guards follow structured tours that walk them through every required task, checkpoint, and inspection; ensuring consistent patrol quality.

Guided tours
Guided patrol tours

Mobile guard app FAQ

What is a mobile guard app?

A mobile guard app gives security officers the tools to run patrols and tours from their phone. With Opspot guards scan QR code and NFC checkpoints, share live GPS location, and generate daily activity reports automatically.

Does the app track guard location?

Yes. Opspot supports live GPS tracking so you can see where guards are in real time, and checkpoint scans confirm that patrols and tours were completed on site.

How do guards check in at checkpoints?

Guards check in by scanning QR code or NFC checkpoints as they complete a patrol or tour. Each scan is logged and rolls up into the automatic daily activity report.

Apple? Android? We’ve got you covered.

Opspot provides a seamless experience for your guards; whether you’re using iOS, Android, or both.

Download on the App StoreGet it on Google Play

Ready to simplify guard management?

Try Opspot free today, no credit card required. With live GPS tracking, patrol tours, and instant incident reporting, you'll see how easy security workforce management can be.